ScienceAugust 28, 2026

Janus: The Army's Plan to Put Microreactors on Bases

Key Vocabulary

milestone/ˈmaɪlˌstoʊn/
A clear goal or step that must be reached in a project.
"Vendors will be paid after each milestone."
prototype/ˈproʊ.tə.taɪp/
The first example of a product used for testing.
"The prototype reactor will be tested at a lab."
resilient/rɪˈzɪl.jənt/
Able to recover quickly from problems or damage.
"A resilient base can keep working during outages."
HALEU/ˈheɪluː/
High-assay low-enriched uranium used as fuel in some advanced reactors.
"Some designs need HALEU, which is in limited supply."

Listening

Janus: The Army's Plan to Put Microreactors on Bases

In August 2026 the U.S. Army announced awards worth up to $2.2 billion to five companies under the Janus program to build and operate nuclear microreactors at five Army installations. The selected firms are Antares Nuclear (Fort Bragg), BWXT Advanced Technologies (Fort Campbell), General Atomics Electromagnetic Systems (Fort Hood), Radiant Industries (Fort Benning), and Westinghouse Government Services (Fort Drum). The contracts are milestone-based and will stretch across fiscal years 2027 to 2031. Vendors will receive government funds only after they achieve specific technical goals, and the prototype reactors will be contractor-owned and contractor-operated.

Officials have said the reactors will supply between one and twenty megawatts each, offering resilient baseload power while installations stay connected to the civilian grid. The Army and the Department of Energy have cooperated on tests and technical reviews, although a limited national supply of high-assay low-enriched uranium (HALEU) remains a constraint for some designs. The service has set a target to have the first installation-operating reactor by September 30, 2028, and leaders describe the program as a step toward wider commercial deployment of advanced reactor designs.

180 words

Quiz

1. When did the Army announce the awards?
2. How much funding was announced?
3. What is the target date for the first installation-operating reactor?

Reading Practice

Read the article from the Listening section aloud. Your AI teacher will give you pronunciation feedback.

Discussion

1

Do you think reliable power at large sites makes daily life safer? Why or why not?

2

Have you ever been without electricity for a long time? What did you do?

3

What do you think about new technologies that are built in factories and moved to a site?

4

Would you feel safer if a large facility near you had a backup power system? Explain.