TechnologyFebruary 2, 2026

AI and Water: Why Data Centers Matter for Local Supplies

Key Vocabulary

infrastructure/ˈɪn.frəˌstrʌk.tʃər/
The physical and organizational systems needed for operations.
"Data center infrastructure includes power and cooling systems."
closed‑loop/kloʊzd luːp/
A system that continuously reuses the same fluid without discharge.
"A closed‑loop cooling system recycles water within the datacenter."
evaporation/ɪˌvæp.əˈreɪ.ʃən/
The process of a liquid turning into vapor and leaving a system.
"Evaporation causes freshwater loss in some cooling methods."
Water Usage Effectiveness/ˈwɔː.tər ˈjuː.zɪdʒ ɪˌfɛk.tɪv.nəs/
A metric that compares water consumed to energy used by IT equipment.
"Improving Water Usage Effectiveness lowers water per kWh."
reclaimed/rɪˈkleɪmd/
Water that has been treated so it can be used again for non-drinking purposes.
"The facility used reclaimed water for some cooling operations."

Listening

AI and Water: Why Data Centers Matter for Local Supplies

Microsoft’s expansion of AI infrastructure is reshaping its water needs, and the numbers are sizable. The company used about 7.9 billion liters in 2020 and about 10.4 billion liters in 2024, and internal forecasts once suggested its annual need could climb to 28 billion liters by 2030; engineers later revised that estimate to roughly 18 billion liters as new cooling designs and better data were incorporated. Such revisions, which reflect both design changes and updated information from leased facilities, show how quickly projections can shift when engineering choices are made.

In some regions the projected demand is especially visible. Projections showed large draws near Phoenix, in parts of India and near Jakarta, places that already face water stress; Microsoft has reduced some site estimates — for example, Phoenix estimates fell when higher operating temperatures were adopted, and Jakarta’s figure was also lowered after updated local data. These place-specific changes underline that a corporate forecast is not the same as a final, locally managed water plan.

To limit freshwater use, Microsoft is rolling out closed‑loop and chip‑level cooling systems that recycle water and avoid evaporation, and it says that ‘Next‑generation datacenters consume zero water for cooling.’ Pilot installations for the zero‑evaporation design are planned in Phoenix and Mount Pleasant, Wisconsin, and the company reports a sustained improvement in Water Usage Effectiveness across its fleet. While such systems can raise energy demand slightly, they can substantially cut the fresh water withdrawn each year.

Even so, companies, communities, and engineers must balance rapid AI growth with local water realities, and transparency about site data will help public understanding and planning.

267 words

Quiz

1. How much water did the company use in 2024?
2. What do next‑generation datacenters consume for cooling?
3. Where are pilot installations for the zero‑evaporation design planned?

Reading Practice

Read the article from the Listening section aloud. Your AI teacher will give you pronunciation feedback.

Discussion

1

Do you worry that new technologies near your town could affect local water? Why or why not?

2

Have you noticed headlines about AI expansion where you live? How did they make you feel?

3

What would you ask a company that wants to build a big facility near your community?

4

Do you think engineers should share more local data about water use? Why?

5

Would you change personal habits if you knew local industry used much water? How?

이 콘텐츠는 영어 학습을 위한 것이며, 사실의 정확성을 보장하지 않습니다.